Eaton Announces Industry’s First Lab Approved for Participation in UL Program for Cybersecurity Testing of Intelligent Products

Eaton

February 15, 2018

Power management company Eaton announced today it is collaborating with global safety science organization UL to advance cybersecurity for power management technologies across industries. The collaboration is helping to establish measurable cybersecurity criteria for network-connected power management products and systems. In addition, Eaton’s cybersecurity research and testing facility in Pittsburgh is the first lab approved to participate in UL’s Data Acceptance Program for cybersecurity. 

Eaton’s cybersecurity research and testing facility in Pittsburgh now has the capability to test Eaton products with intelligence or embedded logic to key aspects of the UL 2900-1 and 2900-2-2 Standards. Through this environment and Eaton’s rigorous cybersecurity process, Eaton is developing a growing portfolio of products to meet stringent specifications, regulations and consumer expectations for safe, secure power management.

Cybersecurity is one of manufacturing’s most critical risk factors (source: BDO 2016 report) and the number of security incidents in this sector was nearly 40 percent higher than the average across all industries (source: 2017 IBM X0Force Threat Intelligence Index). While manufacturers continue to innovate and build safer and more secure technologies, assessing risk is critical as cyber-attacks become more complex and difficult to guard against.

“A connected world needs trusted environments, and as we introduce more and smarter technology that enables us to link more elements of everyday life, trust becomes increasingly important,” said Michael Regelski, senior vice president and chief technology officer for Eaton’s electrical business. “Eaton’s collaboration with UL further expands our commitment to continue advancing these new technologies and innovations, while building trust and ensuring the highest level of defense against emerging cybersecurity threats.”

In another milestone, Eaton’s Power Xpert Dashboard recently became the first power management product certified to the UL 2900-2-2 Standard for cybersecurity in industrial control systems. This user portal to Eaton’s switchgear enables customers to monitor, diagnose and control equipment from a location outside the arc flash boundary.

Through UL’s innovative Cybersecurity Assurance Program, Eaton, UL and other industry organizations are working together to establish foundational requirements for testing of network-connectable industrial control systems to enable protection against vulnerabilities and security risk controls.

“We seek to help manufacturers, their customers and other stakeholders mitigate security risks through science-based assessment and evaluation,” said Ben Miller, president of the Commercial and Industrial business unit of UL. “Our collaboration with experts at Eaton is providing some of the crucial inputs to developing the technical expertise for new standards, and it’s helping advance UL’s efforts to protect our world’s critical infrastructure against ever-increasing cybersecurity threats.”

www.eaton.com/Eaton/OurCompany/NewsEvents/NewsReleases/PCT_3305515

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene