StorageBy Chip Palombini

Providing back up power is essential to providing maximum value for commercial and industrial behind-the-meter energy storage installations.

With ever increasing costs of loss of productivity from power outages alongside the cost of installing energy storage installations, commercial and industrial customers are expecting, and often requiring, back-up power from their demand reduction energy storage installations. But not all energy storage inverters are capable of providing back-up power. This is an important distinction because with favourable economics accelerating the growth of behind-the-meter storage, the requirement for systems capable of backup power will continue to rise. It will be critical for developers and integrators to select systems that are capable of back up power built in meet the short term and long term expectations of their customers and to maximize the benefit for end users.

Here we provide considerations in selecting an inverter to provide backup power with a behind-the-meter energy storage system.

1. Seamless vs. through stop transition

Energy storage inverters have two primary operation modes — grid tied and grid forming. Grid tied mode (also referred to as current source, or ‘PQ Mode’) requires an AC voltage to be present at the point of interconnection with the inverter. In the case of a behind-the-meter (BTM) energy storage installation, AC voltage is established by the power source — typically the utility. During grid tied mode the energy storage inverter will synchronize to the utility’s AC voltage, frequency, and phase. This mode is sometimes referred to as PQ Mode of operation because the inverter can accept two simultaneous set points one for real power (P) and the other for reactive power (Q).

During grid forming mode (also referred to as voltage source, backup mode, or VF mode), the energy storage inverter establishes the AC voltage and frequency via the system’s batteries. The output power — both real and reactive — is supplied by the inverter based upon the impedance of the loads connected to the inverter AC output. The regulation of the AC output current from the inverter to the loads happens in a closed loop. This is analogous to putting a potentiometer across a 5V constant voltage power supply; the constant voltage power supply will modify the output current as needed to maintain the 5V set point. This mode is sometimes referred to as VF mode of operation because the inverter can accept two simultaneous set points one for RMS voltage (V) and the other for output frequency (F).

Many energy storage inverters offer both grid tied and grid forming mode of operation in the same product. However, not all energy storage inverters offer a seamless transition from grid tied mode to grid forming backup power mode. Facilities utilizing inverters with only through stop transition will loose power during the stop state phase: lights will go out, computer and manufacturing systems halted eliminating a portion of losses. Inverters utilizing seamless transition to back up power provide uninterrupted power to the customer’s load and continuous power to all critical needs, eliminating financial losses associated with the majority of power outages. This is why Dynapower employs proprietary seamless transition technology in its inverters — no loss of power or productivity, making the inverter more valuable to the end user.

Backup

 

 

 

 

 

 

 

 

 


Figure 1 shows a typical implementation of a behind-the-meter energy storage system with backup power. In grid tied mode the contactor is closed, this provides a grid connection to the critical loads as well as a grid tied to the inverter. When backup power is need from the behind-the-meter energy storage system the contactor will open, thus isolating the customer’s loads from the grid.

During operation, Dynapower’s inverter continuously monitors the grid’s voltage and frequency. If either the grid voltage or grid frequency go out of the (user’s defined) range, the inverter will implement dynamic transfer by opening the grid disconnect device (in Figure 1 we are showing a contactor) and transitioning to grid forming mode. By opening the contactor the inverter isolates itself and the critical loads from the grid and continues the delivery of power uninterrupted. This type of operation is considered “intentional islanding” and should not be confused with anti-islanding, where power is shut off when a disturbance in the grid is detected.

Additionally Dynapower’s Dynamic Transfer technology establishes a shunt connected uninterruptable power supply (UPS) unlike a traditional “online” UPS. The above notional diagram of a traditional UPS system includes a front end charging rectifier, battery, and an inverter directly servicing the critical load. The disadvantage of this traditional online UPS is that there is efficiency loss since all power to the critical load must go through two stages of power electronics — the rectifier and inverter. In contrast, Dynapower inverters with Dynamic Transfer only have a single stage of power electronics between the battery and critical load, making the energy storage system more efficient. A traditional shunt connected system will flicker if the grid suffers a low impedance (phase to phase short or phase to ground short). However, for high impedance grid faults, the transition for systems using Dynamic Transfer there will be little to no flicker.

Dynapower’s Dynamic Transfer has been used successfully in systems with certifications to UL 1741, IEEE 1547, IEC 62019, and IEC 62040. Dynapower has successful implementations of Dynamic Transfer with motorized breakers, contactors, and static switches used as the grid disconnect device.

2. Ability to scale

As businesses grow, hire more people, employ more equipment and expand facilities they will need to enlarge their energy storage systems. Deployers of behind-the-meter energy storage with backup power should consider the ability of the system’s inverter(s) to easily scale to meet growing needs. Not all inverters can parallel in grid forming mode to easily scale.

3. Cost and time to market for integrating renewables

The integration of additional generating resources, such as solar-PV when the system is islanded, requires integration and controls engineering to ensure that all generating sources (i.e., the battery, solar-PV, and generators) are operating in a safe and balanced method.

Here are four cost and feature considerations:

1. Can the inverter seamlessly transition from grid tied to grid forming mode?
2. Can the inverter parallel with other inverters to meet the system’s growing needs?
3. How easily can the inverter integrate renewable power sources such as PV?
4. How can single phase systems be optimized to lower costs?

Chip Palombini is Energy Storage Group Sales & Marketing Manager, Dynapower Company, LLC. This is a lightly edited version of a Dynapower white paper.

 

Changing Scene

  • Prev
A special jury of industry experts has chosen the winners of the New Product Competition at MCEE ...
May 15 is the deadline to apply for a BC Hydro Aboriginal scholarships and bursaries, available to ...
A strategic collaboration will bring together ABB Ability with IBM Watson Internet of Things to ...
The Board of Directors for Ontario’s Independent Electricity System Operator (IESO) has ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Eaton Canada is pleased to be partnering with RDC Fine homes in their Net Zero home ...
Valard Construction LP CEO Victor Budzinski has retired effective April 1. President Adam ...
More than 9,000 members of Canada’s mechanical, electrical and lighting industries will meet ...
This year's National Day of Mourning, to remember and honour workers who have lost their lives, ...
NEMA OS 4-2016 Requirements for Air-Sealed Boxes for Electrical and Communication Applications ...

R.H. Carroll Safety Awards

The deadline to submit a nomination for this year’s R. H. (Hugh) Carroll Award, created in 1999 by the Electrical Contractors Association of Ontario, is April 28.

The award pays tribute to member firms who best exemplify the dedication and commitment to safety as demonstrated by R. H. (Hugh) Carroll through his years of service. Shown in photo, L-R: 2016 winner Ove Bakmand, President of Net Electric Limited, with ECAO First Vice-President Mark Lloyd and President Dan Lancia.

Read More

 



Tools for the Trade

  • Prev
Dual-flute design makes for faster drilling with less force...    
Eliminate loose pieces and the need for additional tools during setup...      
Utility Ergonomics is the science of evaluating and designing products and work environments around ...
The FLIR CM174 Imaging 600A AC/DC Clamp Meter is the only clamp meter with the power to lead you to ...
Troubleshoot more efficiently, create detailed reports easier, and share images and findings ...
If you install or maintain data cabling, SignalTEK CT allows you to generate PDF test reports that ...
The Non-conductive S-Class® Fiberglass Fish Tape is designed for use around energized sources. The ...
Magnetic Wire Pulling System Versatile wire pulling tools for low voltage applications. Each of ...
Speeds up the entire bending process up to 30%, Built-in protractor for quick and accurate bends, ...
The Maxis® XD10 EXTREME Duty Cable Puller is designed to get the job done, thriving in the most ...

Product News

  • Prev
  Indoor LED flex strips are a unique and eye-catching lighting system that is highly ...
  The Bi-Directional interface enables streamlined configuration of smart luminaires that ...
  The new teardrop, focus and flight track heads are high-powered LED fixtures that provide ...
  Greenpower LED production module is making indoor growing easier and more efficient. ...
  For those areas that only receive sporadic traffic occupancy sensors ensure that the ...
      The Airo LED pole combo provides all outdoor lighting needs, and ...
  Lumentalk is a patented power line communication technology that uses existing AC mains as ...
  Light Tape is a versatile backlighting system. The printing process utilizes black out to ...
      The RAB AWL adjustable wall lights are ideal for perimeter ...
  EXM BOXCAD makes ordering custom enclosures easy with its 3-step process. The objective ...

Fluke Power Logger

Fluke 1735 three-phase power logger. The Fluke Power Logger is the ideal electrician’s power meter for conducting energy studies and basic power quality logging. Set the Power Logger up in seconds with the included flexible current probes and color display. The power quality meter measures most electrical power parameters, harmonics, and captures voltage events. Has on board battery capable of operating for 12hrs without backlight and 6hrs with backlight on. The meter is also equipped with 4mb’s of internal memory with 3.5mb’s dedicated to measuring data.

Read more: Fluke 1735 Three-Phase Power Logger...

 

 

 



Peers & Profiles

  • Prev
  Most of us have a difficult enough time managing one job and a home life. However, some ...
  Since 2012 Barnstormer has advanced the abilities of their brewery with the installation ...
  Electrical Industry Canada was recently given the unique opportunity to see ...
  Vickery Electric has been providing electrical services to the Whitby area since 1923, ...
Safety standards in the electrical industry are constantly evolving, which requires that ...
Newman Electric was founded in 1995 and has established itself as a leading electrical contractor ...
Schneider Electric, a global specialist in energy management and automation, today announced ...
New York City’s Queens-Midtown tunnel is the latest lighting project to be undertaken by ...
Aesthetics, design, flair, anchored in his community, these are words easily associated with ...
Jason Prevost is National Chair of Electro-Federation Canada (EFC)’s Young Professionals ...

The Power of Brewing

Applications for electrical control panels and automation have reached nearly every sector imaginable, including the brewing industry. In Canada, micro breweries are on the rise, and one of leaders of that charge is Barnstormer Brewing and Distilling Co located in Barrie, Ontario. Owned and Operated by Dustin Norland, since 2012 Barnstormer has advanced the abilities of their brewery with the installation of electrical controls for monitoring brewing temperatures, emergency electrical shut-off switches to protect staff and equipment, and implemented a fully automated filling and seaming system.

 

Read more: Barnstormer Brewery...

 

 

 

 

 

 

Copper $US Dollar price per pound

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
2016 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil