Canadian Electrical Industry News Week

Andrew Morrissey

Safety standards in the electrical industry are constantly evolving and requiring that contractors adapt to changes as fast as they occur. H.J. Bartlett Electric Inc. has evolved along with the changes to ensure it provides the most update to date protection for its workers.

H.J. Bartlett Electric has been in the industry for more than 24 years and is a leading electrical contracting firm serving Newfoundland and Labrador. The company has a strong commitment to the community and is known for its excellent communication and commitment to its customers. The company provides a wide array of electrical services including commercial, industrial, institutional, new construction and design build.

To ensure its continued success, H.J. Bartlett Electric Inc. has found in Andrew Morrissey the knowledge and commitment to ensure all its staff are trained on and are practicing current safety standards.  

Andrew first entered the electrical industry in 2002 as a first-year apprentice with H.J. Bartlett Electric. Since then he has worked his way up to superintendent and safety manager of all major and minor projects.

Andrew has great things to say about the company and its support throughout his career and as a growing company. “I owe a lot to the company I work for. HJ Bartlett Electric has big support systems that have allowed me to develop and grow our safety program. We believe in the safety of the workers and back that up with making sure they follow the guidelines ands regulations.”

 Andrew says he had always wanted to work in the trades because of the feeling of accomplishment one gets from working in the trade industry. He reflects that his position as safety manager developed because “I wanted and still want to be there for the workers and ensure their safety and understanding of the safe work policies that are put in place to protect their livelihoods.”

Andrew Morrissey

When asked about changes in the industry’s safety regulations, he points out that “all areas of safety regarding the electrical industry are always moving forward to better the safety of all workers.” He does however further note that “fall protection regulations have changed so much in the last 15 years, it is clear that the regulations have reduced injury and saved lives.”

As a safety manager Andrew ensures H.J. Bartlett’s safety training program meets or exceeds safety regulations, which he believes is a primary reason for the company’s continued success. “Working in the field and alongside our own employee’s day in and day out, I can see big changes in the knowledge our employees have due to the fact that the training and re-training guidelines are much stricter than ever before. We ensure workers are trained and re-trained within a time frame that does not allow them to become complacent in the work place.”

When asked what he would say to anyone considering entering the electrical industry, he replied “A message I would send to an individual young or old entering the industry would be to keep their eyes open to the many different opportunities the industry has to offer. The trade has many different aspects and all should be ventured.”

As an electrician and dedicated member of H.J. Bartlett, Andrew continues to advance his knowledge and the company’s focus on the safety of its employees, ensuring H.J. Bartlett maintains its position as leading electrical contractor.

 

 

http://www.hjbartlettelectric.com/

Changing Scene

  • Prev
  A contract worker received an electrical shock after coming into direct contact with ...
  Rittal Systems has announced Franklin Empire has joined its distribution/partner network ...
  FortWhyte Alive is unveiling the largest solar installation in the City of Winnipeg. ...
  In partnership with TM4 Inc. and Cummins Inc., STL recently announced plans to test two ...
  Several media outlets and analysts recently published statistics about the number of ...
  Falling costs, an expanding customer base, and growing recognition of the role clean ...
  The Weidmüller Group has announced the acquisition of the W Interconnections group ...
FLIR has a new line of clamp and digital multimeters, debuting at NECA 2017. This collection ...
  The Renewable Energy Program (REP) has positioned Alberta to be Canada’s largest ...
  Energy Storage Canada (ESC) applauded the announcement made by Glenn Thibeault, Ontario ...

Irwin Beron RAB Design has announced the retirement of President, Irwin Beron.  After 50 years in the lighting industry, Irwin has decided to step down as President and hand over the reins to his eldest son, David Beron.  David will assume the position of President, effective immediately.  Irwin will remain on as Chairman, which will allow him to enjoy some well-deserved rest and relaxation with his lovely wife Lynette and seven grandchildren, yet still free to impart his many years of experience and expertise whenever possible as Chairman of RAB Design. Irwin has been serving as President of RAB Design Lighting since 2002.  He acquired the company during a difficult period and through grit, determination and hard work, turned it around to make it one of Canada’s most respected lighting companies.

 

Read More: Irwin Beron Retires as President of RAB Design... 

 

 

 

Electricians Provide Assistance in TD Centre's 50th Anniversary Illumination Project

Contractors Guild, Ainsworth, Symtech, Plan and ACML donated their services to temporarily reconfigure the buildings' automated lighting systems, while a crew of staff and volunteers worked to open and close blinds on over 6,000 windows across the TD Centre's five towers to create the message "Less is more or" in 100-foot-tall lights.

A media statement called it the largest public art project of its kind undertaken anywhere in the world.

Read more: Electricians Provide Assistance...

 

Codes and Regulations Brought to You by the CSA Group

  • Prev
In this article: Section 58 — Passenger Ropeways and Similar Equipment. Rule 58-000 ...
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...
  In this article: Section 40 — Electric cranes and hoists. The CE Code is a ...

CSA

 

By William (Bill) Burr

In this article: Section 56 — Optical fibre cables. Section 56 is a supplementary or amendatory section of the code and applies to the installation of optical fibre cables in conjunction with all other electrical systems. Rule 56-002 provides a special terminology definition for an Optical Fibre Cable — a cable consisting of one or more optical fibres that transmits modulated light for the purpose of control, signalling or communications.

Rule 56-102 outlines that there are three types of optical fibre cables.



Tools for the Trade

  • Prev
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...
  This new lock box is ideal for group lockout situations with multiple isolation points ...
  Greenlee has taken their standard storage boxes to the next level with the limited ...
  The SureTest circuit analyzers "look behind walls" to identify wiring problems that can ...
  The Ideal Dispenser is equipped with high-quality adhesive and 3 mil thickness that ...
  The Adjustable cable stripping tool has an intuitive blade design that allows users to ...
  The SIMpull CoilPAK completes the SIMpull Circuit Management System, taking heavy, ...
  The Javelin is a new product that makes drilling holes through stud walls easier. ...

Latest Articles

  • Prev
If you had researched the Industrial Internet of Things online in the mid-1990s, there might have ...
Small business owners usually cringe at the thought of tax season. They are busy enough with their ...
This is the second of a two-part article on Fluke’s new TC electrical tester. Part 1 explored ...
  The global smart building market is projected to grow from an estimated $US7.42 billion ...
  I spent most of my formative years growing up in a northern British Columbia community, ...
  For many years, electricians and technicians looking for a quick current reading have ...
  The Canadian Electrical Code, Part I, is an integral part of the Canadian electrical ...
  Canadian municipalities issued $7.9 billion worth of building permits in July, ...
Demand for healthcare is outstripping capacity, but Toronto’s Humber River Hospital has a ...
  An iconic architectural feature of the Montreal skyline by day, the Jacques Cartier ...

Wind Farm

 

Wind technicians have been working to keep Canada’s turbines turning for a long time now.

TransAlta’s Cowley Ridge Wind Farm was one of the first commercial facilities in the country with the original technicians back in 1993 describing their experiences of being “up so high” and that “there was nothing like it.”

Sitting on 25 meter tall lattice work towers, these machines were less than a third of the height of most tubular wind turbine towers today. However, many of the same skills learned on these first sites are still relevant today even though the technology has certainly progressed.

Read More: The Road Behind and the Road Ahead... 

 

 

 

Product News

  • Prev
Standard's LSHOP series is an integrated solution for quick and easy installation; no wiring ...
  LUBO Lighting International Inc. has a new generation of outdoor lighting fixtures with a ...
  Arlington's Bare Wire Ground Clamp is made of solid brass with brass screws that is easy ...
  The Canadian Wire Connector Kit is ideal for service technicians and is easy to use and ...
  Electronic controllers for district heating and domestic hot water systems. The ...
  Nesco provides a wide range of explosion proof fittings for hazardous location sealing. ...
  Our uninterruptible power supplies for AC applications provide a pure sine curve at the ...
  Southwire's SIM pull Copper RW90 is for open wiring and use in raceways (except ...
  Bollards in the standard 42-inch format and lighted columns with a maximum format of 84 ...
  This driver detects the power and voltage needs of the attached OLED and drives the ...

 

Copper $US Dollar price per pound

How One Hospital Is Improving Patient Care with Advanced Analytics Demand for healthcare is outstripping capacity, but Toronto’s Humber River Hospital has a solution: a digital Command Centre powered by GE’s Wall of Analytics. As populations grow and age, many hospitals are being stretched past their limits. Rather than apply temporary or partial fixes to address the challenges that underlie this busy, acute care hospital, Toronto’s Humber River Hospital has chosen to implement a holistic, state-of-the-art hospital command centre that will enable it to achieve radical gains in quality and efficiency.

The hospital partnered with GE Healthcare Partners to conceive, design and build the new 4,500 square-foot command centre, a cornerstone of which will be GE’s Wall of Analytics that processes real-time data from multiple source systems across the hospital.

Read more: How One Hospital is ...

 

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
2016 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil