Canadian Electrical Industry News Week

Code Changes Roundup

Bill Burr

Read Part 2 Here

Often, users encounter situations where they find themselves at odds with the rules contained in the Canadian Electrical Code, Part I (the Code).These situations can occur for designers, consultants, installers, inspectors, manufacturers, students, instructors and standards developers alike, and usually result from a misreading, misunderstanding, misapplication or inability to locate the requirement that is needed or relevant to their tasks.

The Code is a comprehensive document. Sometimes, trying to find information quickly can seem quite daunting.Over the next series of articles, I will provide a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook2, but will hopefully provide some help in navigating the Code.

Introductory pages and preface

The first few pages contain the Table of Contents, the names of the main technical committee and sub-committee members, and the all-important information in the preface. Why is the preface so important? Well, the preface, in addition to a list of reference publications, explains how the Code is organized. This arrangement of the outline provides a road map to finding your way. With this tool you can direct yourself to the exact rule or sub-rule that is the subject of your quest.

The first guidepost, indicated in the preface, is that 

• Sections 0 to 16 and Section 26 are general sections that apply to all installations

• all other sections, which apply to specific situations, amend or supplement these general sections.

The usefuleness of this key distinction will become clearer later in our exploration. The preface doesn't mention this, but Appendix A and C are normative (mandatory), and all the other appendices are informatory (non-mandatory) parts of the Code. The Tables and Drawings pages are also normative. 

Section 0

Moving on to Section 0, we discover the object and scope of the Code, and the definitions of terms contained in the code.

Object

The object states that this Code establishes safety standards for the installation and maintenance of electrical equipment, where consideration has been given to the prevention of fire and shock hazards, as well as proper maintenance and operation.It also notes that the Code addresses the fundamental principles of protection for safety contained in Section 13 of IEC 60364-1, which is the International Electrotechnical Commission (IEC) standard for low voltage installations (1000 volts or less). You can examine these principles in Appendix K.

We are made aware, by the Object statement, that compliance with the requirements of the Code and proper maintenance will ensure an essentially safe installation, as protection against electric shock, thermal effects, over-current, fault currents, and over-voltage will be met.Also noted is that alternatives to the Code that comply with the fundamental principles of IEC 60364-1 may also be used to achieve safe installations, but only if used in conjunction with acceptable means to assess compliance, by the authorities enforcing the Code.This provision is intended for and usually applies to an industrial installation, under a specific safety management program developed with the authority having jurisdiction. Since the Code is adopted into law by each jurisdiction, any amendments or alternatives must also be adopted into law in that jurisdiction.

Scope

As we move to the Scope statement, we discover that basically all electrical work and equipment is covered by the Code with the exception of

• installations employed by a utility in its function as a power or communication utility

• electric railways

• aircraft

• ships that are not connected to a shore supply for more than five months

If you are looking for rules that apply to a mine or quarry, there are additional requirements in CSA M421.

Definitions

Next up are the definitions. The definitions contained in Section 0 are for specific words or terms used in the Code to aid in understanding and interpretation. An ordinary dictionary meaning applies for any word or term that is not specifically defined in Section 0.These definitions apply generally throughout the CE Code. However, some sections also contain definitions that apply to terms used only in that particular section.It is very important that you check these definitions when reading any specific rules.Although you may have a general idea of the meaning of a term, the Code definition can sometimes affect the application of the rule. 

As an example let's look at the definition of the word Approved(as applied to electrical equipment).It is generally acknowledged that electrical equipment needs to be certified by a certification organization to be approved.But wait! There's more! According to the definition, that certification organization needs to be accredited by the Standards Council of Canada (SCC), and in addition, the product needs to be certified that it meets the requirements of

• CSA safety standards for electrical products (Part II standards), or

• other standards developed by an SCC accredited standards development organization (SDO) or other recognized documents where CSA Standards do not exist for that product.

In the case of non-CSA standards or other recognized documents, they must be correlated with the Code and also must not duplicate standards listed in Appendix A. The definition also conveys alternatively that equipment meeting the requirements of the regulatory authority is also considered approved. This normally refers to field evaluation by an accredited special inspection body that is recognized by the authority having jurisdiction and facilitates the approval of new or limited manufacture products. So you see, a lot of information is contained in this definition of Approved. The Appendix B note on this definition would also be very beneficial to the Code users.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 - Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 - Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

 Legrand: the Adorne Collection Video Gallery 

Legrand Adorne CollectionThe adorne collection makes life simply beautiful, putting a stylishly smart finishing touch on your home. With adorne you will discover real-world inspiration for turning the ordinary into extraordinary with re-imagined switches and other solutions you have to see to believe. Check out the extensive adorne video collection to learn more about adorne and the advantages in can bring to any home.

 

 

 

 

Watch the video Here

 

Changing Scene

  • Prev
Electricity Human Resources Canada has introduced a new Board of Directors, effective as of their ...
Jacques Fiset, the new president of the EFC Quebec section, told us in a recent interview that his ...
Organised by the Hong Kong Trade Development Council (HKTDC), the twin lighting shows - the  ...
A Friday night, the end of summer, the weather is mild, and 2,500 people — customers, ...
Eaton focuses on developing personable connections in every aspect. In September, our team will be ...
During the recently held IMARK Canada 2019 meeting in Niagara Falls, executives from 14 of the ...
Valard has been selected by Wataynikaneyap Power LPto provide engineering, procurement ...
The Canadian Apprenticeship Forum-Forum Canadien sur l’Apprentissage (CAF-FCA) has announced ...
Electricity Human Resources Canada has announced this year's keynote speakers for Agents of Change ...
Kiashke Zaaging Anishinaabek (KZA)/Gull Bay First Nation (GBFN) and Ontario Power Generation (OPG) ...

Green PlugndriveThe Government of Quebec, Ingka Group (IKEA), City of Madison and several other industry and organization innovators have pledged to join CALSTART’s Global Commercial Vehicle Drive to Zero (Drive to Zero) program. 

“By joining the Drive to Zero pledge, Québec is committing to share its transportation electrification knowledge and expertise and coordinate its efforts with those of all partners to make zero-emission technology commercially viable by 2025 in the heavy vehicle sector...

 

Read More

 

 

 

Humber CollegeLike many higher education institutions, Humber College is committed to sustainability. But at Humber, they take that commitment to the highest level. The Toronto college instills sustainability across every facet of the school and has had numerous accomplishments from their projects and partnerships that link community engagement and academics. One impressive result is that Humber has been named one of Canada's greenest employers for four consecutive years (2016-2019).

 

 

Read More

 

 

Tools for the Trade

  • Prev
  IDEAL Industries has introduced Combination Drill Taps to its tool lineup. Combining the ...
  Stripping and crimping device, 100 - 240 V input voltage, for insulated ferrules with a ...
Professional all-in-one cutter/stripper for coaxial and twisted pair cables     ...
  Klein Tools' Coax Explorrer 2 tests coaxial cable and maps up to 4 locations   ...
  Ideal Industries' T-14 wire stripper s are ideal for all professionals working within the ...
  The ATS850 conveyor eliminates all types of electro static discharge requirements. ...
  Lorik Tool & Automation has the experience and ability to manufacture a variety of ...
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...

Product News

  • Prev
ABB launches NeoGear low-voltage switchgear.        
Banner’s new WLB72 Basic strip light is a bright, high-efficacy LED task light for use in ...
Just because wire diameters are decreasing, it doesn’t mean the data needed to identify ...
Littelfuse have expanded its line of POWR-SPEED PSR series high-speed fuses by adding 275 new ...
  With a 30+ year track record for excellence in linear lighting, ML / NSL takes you into ...
The SYLVANIA ValueLED UFO High Bay is a DLC Premium LED fixture that has a lightweight, impact ...
Power Integrations announced new high-power-density members of ...
Tray portrays a picture frame design. The intention was to evoke the idea of empty picture frames, ...
Magic Lite introduces the next generation of their hugely successful LED Brick ...
The adorne Collection has expanded their line of designer switches and outlets to now come in the ...

 

LYTSwitch DriversPower Integrations announced new high-power-density members of its LYTSwitch™-6 family of safety-isolated LED-driver ICs for smart-lighting applications. The new ICs with PowiGaN™ technology enable designs that deliver up to 110 W with 94% conversion efficiency using a simple, flexible flyback topology.

The high efficiency of the new LYTSwitch-6 ICs eliminates the need for heatsinks – greatly reducing ballast size, weight and cooling airflow requirements. The 750 V PowiGaN primary switches provide very low RDS(ON) and reduced switching losses. 

 

Read More

 

 

Betacalco TrayTray portrays a picture frame design. The intention was to evoke the idea of empty picture frames, characterized by a similar concave design, for use in high-end architectural environments. Tray is a fresh contemporary alternative to traditional lightbox style fixtures. With sloped back and side surfaces, Tray creates a floating effect when mounted on ceilings.

 

 

 

 

 

Read More

 

Peers & Profiles

  • Prev
Stephanie Medeiros leads ABB Canada’s Electric Vehicle Charging Infrastructure team, as well ...
Electrical Industry Canada had the pleasure of interviewing Matt Davis of Newfoundland Power, ...
An electrician by trade, Daniel Lacovetsky is the founder and President of Powertec Electric, an ...
Mike Morneau began his professional career in graphic arts after earning a Bachelor of Technology ...
AimLite offers a vast choice of lighting lines to facilitate any lighting project’s needs. ...
John Krill has been in the energy and construction industries for 35-years, now he serves as Canem ...
Ali Heighton is the Program Coordinator for IBEW Local 37 who has found success as a young ...
Flextherm was founded in 1991 by current company President, Philippe Charron. For more than 25 ...
Ouellet Electric Heating began humbly in 1960 with Charles-Emile Ouellet, who started manufacturing ...
Justin Harris is a Programmer/Electrician for COREngineering, a New Brunswick based mechanical ...

 

Stephanie MedeirosBy Blake Marchand

Stephanie Medeiros leads ABB Canada’s Electric Vehicle Charging Infrastructure team, as well as transit bus charging in the United States and Canada. She has been with ABB in various positions for 10 years, compiling a diverse skill set that includes work all over the world.

After receiving a degree in Electrical Engineering from McGill University, Medeiros got her start in the industry out of school volunteering with the Canadian government as an electrical engineering intern, where she travelled to Peru to help improve their water treatment infrastructure. 

Read More

 

 

Copper $US Dollar price per pound

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2019 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil