Safety FlukeBy James R. White

With the recent release of the 2018 edition of the NFPA 70E standard, many users are finding it challenging to interpret what it says and prioritize where they should focus their attention. The short answer is that the entire 70E standard is important, not just one chapter, article or section. However, this article highlights 10 changes that the author believes are most important. Here in Part 1: changes 1-5.

  1. New Table 130.5(C), Estimate of the Likelihood of Occurrence of an Arc Flash Incident for ac and dc Systems

This table replaces Table 130.7(C)(15)(A)(a), Arc Flash Hazard Identification for Alternating Current (ac) and Direct Current (dc) Systems in the 2015 70E standard (see figure 1a). In addition to the title and location change, the new Table 130.5(C) in the 2018 standard changed the third column heading from “Arc Flash PPE Required” to “Likelihood of Occurrence”. Section 130.5(C) of the 2018 standard also states that “Table 130.5(C) shall be permitted to be used to estimate the likelihood of occurrence of an arc flash event to determine if additional protective measures are required.” Use of arc flash-rated clothing and PPE is one of the additional protective measures listed (see Figure 1b).


Fluke














Figure 1a

Table 130.7(C)(15)(A)(a) (Partial) NFPA 70E 2015 Edition
Fluke 2














Figure 1b

Table 130.5(C) (Partial) NFPA 70E 2018 Edition

Why the change?

The 70E standard is written for field electrical workers, not for engineers or attorneys, although they may use it. Over the last several cycles, the 70E committee has tried to improve the usability of the standard, especially the arc flash PPE tables, to make it much easier for field electrical workers to use. By moving Table 130.5(C) into the body of the standard it can be used as part of an arc flash risk assessment for both the Table Method and when arc flash warning labels are used.

Bottom line

The new table is useful, but it cannot take the place of experience or expertise. This table should be used cautiously. The person in front of the equipment about to perform a task must determine its suitability and assess the equipment’s condition, including its condition of maintenance, before performing that task. Use of this table is “permitted”, meaning it’s an option — it can be used, but is not mandatory. At the end of Table 130.5(C) it states that to use the table, equipment must be in normal operating condition:

“Equipment condition considered to be ‘normal’ if all of the following circumstances apply:

  • The equipment is properly installed in accordance with the manufacturer’s recommendations and applicable industry codes and standards.
  • The equipment is properly maintained in accordance with the manufacturer’s recommendations and applicable industry codes and standards.
  • The equipment is used in accordance with instructions included in the listing and labeling and in accordance with manufacturer’s instructions.
  • Equipment doors are closed and secured.
  • Equipment covers are in place and secured.
  • There is no evidence of impending failure such as arcing, overheating, loose or bound equipment parts, visible damage, or deterioration.”

Be sure also to read and understand the note (*) at the end of the table that states, in part:

“The estimate of the likelihood of occurrence contained in this table does not cover every possible condition or situation, nor does it address severity of injury or damage to health. Where this table identifies “No” as an estimate of likelihood of occurrence, it means that an arc flash incident is not likely to occur. Where this table identifies “Yes” as an estimate of likelihood of occurrence, it means that additional protective measures are required to be selected and implemented according to the hierarchy of risk control identified in 110.1(H).”

Be aware that “Not likely to occur” does not mean it won’t happen. It just means there is a reduced risk of occurrence. Use your best judgement, in addition to this table, when assessing risk.

  1. DC voltage shock threshold changed back to 50V

This threshold was changed back to 50V from 100V to comply with OSHA regulations.

Why the change?

In the 2015 70E review cycle, the shock threshold for dc volts was changed to 100 Vdc (see Figure 2a) after a majority the 70E committee was convinced to do so by a very convincing dissertation from a well-respected speaker.

Fluke 3













Figure 2a

Table 130.4(D)(b) (Partial) NFPA 70E 2015 Edition

Although technically, the speaker was correct, OSHA didn’t agree with him. So during the 2018 review cycle OSHA distributed a letter of interpretation to the committee, dated September 4, 2015, stating that OSHA would cite any employer who did not observe its 50 Vac or Vdc threshold. The letter included examples where workers had been killed by voltages under 50 V. Based on the input from OSHA, the committee reversed its stance on the shock threshold and went back to the 50 Vdc value (see Figure 2b).



Fluke 4






Figure 2b

Table 130.4(D)(b) (Partial) NFPA 2018 Edition

Bottom line

The shock threshold for ac and dc voltages is once again 50 V to comply with OSHA regulations. This is based on a section of the Foreword in the 70Estandard that states, “The committee would develop a standard for electrical installations that would be compatible with the OSHA requirements for employee safety…”

  1. New Table 130.5(G), Selection of Arc-Rated Clothing and Other PPE When the Incident Energy Analysis Method Is Used

In the 2018 70E standard, Table 130.5(G) replaces Table H.3(b) from the 2015 standard. The new table provides guidance on how to select PPE when using the incident energy analysis method and was moved to the body of the standard.

Why the change?

In previous editions of the 70E standard, Table H.3(b) (see Figure 3a) was located in Informative Annex H. Workers commented that there was no method for selecting all the PPE required when using the incident energy analysis method, because Table H.3(b) was in Annex H and anything in the annexes is not considered part of the standard. As a result, Table H.3(b) was not being used as intended. In the 2018 70E the table was modified to eliminate any clothing or PPE under 1.2 cal/cm2, because it only deals with arc-rated clothing and other PPE. The table was renamed Table 130.5(G) and put into the body of the standard. Its use is “permitted”, meaning it’s an option — it can be used, but is not mandatory.
Fluke 5
















Figure 3a

Table H.3(b) (Partial) NFPA 70E 2015 Edition

 

Fluke 6










 

Figure 3b

Table 130.5(G) (Partial) NFPA 70E 2018 Edition

Bottom line

If arc-rated clothing and PPE are to be selected using arc flash warning labels, Table 130.5(G) can be used to assist in choosing arc-rated and other PPE. Users are cautioned not to mix the Table Method with the incident energy analysis method for selecting their arc-rated clothing and PPE. The two methods are not compatible and could cause issues. The Table Method is used when estimating the available fault current and operating time of the overcurrent protective device (OCPD). Table 130.5(G) is used when the equipment has arc flash warning labels on it.

  1. 70E Committee sets minimum CPR and First Aid training intervals.

The 2018 70E edition now states in 110.2(C)(2)(d), “Training shall occur at a frequency that satisfies the requirements of the certifying body.” Thus the 70E committee sets minimum requirements for CPR and First Aid training, not best safe work practices.

Why the change?

In previous editions of the 70E, CPR, First Aid, and AED training were required annually. This may have been more frequent than the requirements set by various organizations (such as the American Heart Association (AHA), for the general public, but electrical workers face a much greater risk from ventricular fibrillation due to shock than the general public.

During the 2018 70E review cycle the issue came up that the 70E does not set best safe work practices; it sets minimum requirements. Companies are to meet or exceed the requirements in the 70E.

Bottom line

The idea of the 70E standard setting minimum standards vs. best safe work practices has been the subject of several discussions among committee members in the past. In general, the committee has voted to establish that the 70E standard indeed sets minimum requirements, not best safe work practice. As part of that approach, the standard states that the training interval requirement follows that of the certifying body. For example, if the American Heart Association’s interval for recertification is two years, that is the new requirement from the 70E. However, as a practical matter workers are probably not going to remember how to perform CPR or first aid under the stresses of an emergency situation, knowing that someone’s life could hang in the balance, after more than a year. So the author strongly recommends annual training for CPR, first aid, and/or AED use (if an AED is available at the work site.)

  1. Forget the 40 cal/cm2 incident energy threshold

Incident energy is not a good measure of the pressure wave that might be created by an arc event. The committee did not want workers to think that an arc event under 40 cal/cm2 was not serious.

Why the change?

In previous editions, the 70E contained an informational note in 130.7(A) that stated, “When incident energy exceeds 40 cal/cm2 at the working distance, greater emphasis may be necessary with respect to de-energizing when exposed to electrical hazards.” This was the “line in the sand” companies and workers used to determine what was safe and what could not be worked on. However, that is not what the Informational note said. It stated only that extra efforts should be made to de-energize equipment, not that it could not be worked on. In general, most people would say that equipment rated above 40 cal/cm2 is off limits. I’m good with that.

The problem with that informational note is that it was created during the 2000 review cycle. Our understanding of arc flash and arc blast has changed considerably since then. There are situations when incident energy below 40 cal/cm2 might be more hazardous than when it is above that level. For example, a fault that releases 40 cal/cm2 over 30 cycles will create less arc pressure than one that releases its energy in two cycles, all things being equal. We now know that pressure wave (arc blast) is related to the fault current, not incident energy, because it is an instantaneous event.

Bottom line

There is no such thing as a “safe” arcing fault. Incident energy is not a good measure of the pressure wave that might be created by an arc. Equipment rated above 40 cal/cm2 should be de-energized before being worked on. But equipment rated below that level should be because an arc event under 40 cal/cm2 can be serious as well.

Author’s note

This 2-part article only touches on some of the revisions to the 2018 edition of NFPA 70E. Many recurring or global changes are not covered here. The NFPA 70E committee reviews the actions it has taken in the past, then tries to improve what is written to make the 70E as clear and usable for the field service technician as possible. It is up to the user to interpret the 70E and apply it in the workplace. The author suggests that each user visit the NFPA 70E page and review the actions and committee statements for each action. These provide even more insight into why the committee took a specific action and the intent of that action.

James R. White is Vice President of Training Services, Shermco Industries for Fluke Corp.

Watch for Part 2 in an upcoming issue of EIN.

Image source: Graphic Products

 

 

 

 

 

Changing Scene

  • Prev
Skills Ontario Summer Camp is a week-long day program for kids entering Grades 7-9.   ...
  Glen Dimplex Americas is proud to announce that its Vancouver facility was recently ...
May 13 to 19 is Powerline Safety Week in Ontario, which is meant to inform people across the ...
Divisional Lighting Manager Salma Siddiqui, the initiative will focus on making Westburne the ...
As of April 30, Natural Resources Canada has new dry-type transformer energy efficiency ...
Ontario Power Generation (OPG), in partnership with the Six Nations of the Grand River Development ...
The Energy Council of Canada has chosen of Fort St. John, BC Mayor Lori Ackerman as Canadian Energy ...
The winners of the New Products Competition at the MCEE 2019 trade show were announced tonight; ...
The year was 2002: Jean Chrétien was Prime Minister, Avril Lavigne topped the charts, the ...
The company’s wholesale locations will be branded Robinson Supply, and the lighting and bath ...

Electrician Forum Brought to you by Schneider Electric

As industry experts you know the products you use everyday better than anyone and should have input on what information you receive about products and what could improve them.

Therefore, we want your insight on the biggest challenges or issues you face when installing loadcentres, breakers (CAFI, GFI's…) and other surge protection devices. We ask that you do not provide product specific details but rather your general issues and concerns or any questions that have come to mind while working with these product types. Provide us with your valued expert insight into the issues you have faced so manufacturers can better inform you about the installation and use of these products. Lets generate some discussion that will help guide the Industry.

Make your comments  HERE

 

ESA Powerline SafetyThe invisible impact of powerlines should never be underestimated. In the past decade alone, 19 people in Ontario have lost their lives from overhead powerline contact. May 13 to 19 is Powerline Safety Week, which is meant to inform people across the province to stay vigilant of powerlines when doing work at home or on the job.

"Our work in raising awareness of powerline safety won't be finished until there are zero injuries or lives lost from contact," says Dr. Joel Moody, Chief Public Safety Officer, Electrical Safety Authority (ESA). "All it takes is a misstep or careless error to change the life of you, your colleagues or family."



Read More

 

 

 

 

ABB Eco FactoryABB has an extensive portfolio of eco-efficient solutions and services that can help decouple economic growth from environmental impacts. In fact, over half of ABB's worldwide revenues are generated by technologies that combat the causes of climate change. The company’s goal is to increase this contribution from 57 percent in 2018 to 60 percent by 2020.

The company’s commitment to combatting climate change includes limiting the environmental impact of its own operations. ABB’s current target for climate action is to reduce its own GHG emissions by 40 percent by 2020 from a 2013 baseline.



Read More

 

 

Codes and Regulations Brought to You by the CSA Group

  • Prev
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
In this article: Tables — Part B. This section of the Code contains 99 tables of essential ...
In this article: Section 58 — Passenger Ropeways and Similar Equipment. Rule 58-000 ...
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...

 

Wind Energy

Canada’s wind energy industry further expanded its installed capacity in 2018, while solidifying its status as the lowest-cost source of new electricity generation. Newly commissioned projects brought total national wind energy capacity to close to 13,000 megawatts (MW). Meanwhile, competitive auction results in Saskatchewan and Alberta confirmed the wind industry’s ability to continue to deliver record-low prices.

The six wind energy projects that were powered up in 2018 added 566 MW of installed capacity — a continuation of steady growth that contributed to an average annual growth rate of 20% per year since 2008.

Read more about Wind Energy...

Tools for the Trade

  • Prev
  IDEAL Industries has introduced Combination Drill Taps to its tool lineup. Combining the ...
  Stripping and crimping device, 100 - 240 V input voltage, for insulated ferrules with a ...
Professional all-in-one cutter/stripper for coaxial and twisted pair cables     ...
  Klein Tools' Coax Explorrer 2 tests coaxial cable and maps up to 4 locations   ...
  Ideal Industries' T-14 wire stripper s are ideal for all professionals working within the ...
  The ATS850 conveyor eliminates all types of electro static discharge requirements. ...
  Lorik Tool & Automation has the experience and ability to manufacture a variety of ...
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...

Solar Cell

A joint research team has developed a new type of highly flexible and stable solar cell that could be used in wearable electronics.

The power supply is vital to the safety of wearable electronics. Perovskite solar cell (PSC) has been widely used to manufacture flexible batteries because it is highly efficient, cheap, and easy to use. Perovskite is a material with the same type of crystal structure as calcium titanium oxide.

The flexible substrate is the key factor to determine the performance of PSCs.

Read more about Flexible Solar Cells...

 

 

Product News

  • Prev
Single Phase Power Solutions introduces the 1-to-3 Power Source features a BELLE Motor which uses ...
Rolling Motion Industries (RMI) has released for production the next two in it's series of highly ...
Take a step towards the factory of the future with an ultra compact machine automation controller ...
Available immediately, the FE060-25-EM is the first servo drive of the new FlexPro digital drive ...
Kollmorgen has launched the VLM servo motor series to fill the gap between stepper and ...
Altivar Machine ATV340, a variable speed drive designed for Original Equipment Manufacturers ...
You can wire conductor cross sections of up to 185 mm² very quickly using the PTPOWER 185 ...
Fluke's award-winning 754 does the work of several tools - sourcing, simulating and measuring ...
B&R's latest addition to its Compact-S series is a compact controller with an ...
The F4T with INTUITION temperature & process controller from Watlow offers a wide range of ...

Flir VP40FLIR Systems have released the FLIR VP40, a non-contact voltage detector for use in North America designed for field-troubleshooting and verification of residential, commercial, and industrial electrical installations. The VP40 makes it easy to quickly troubleshoot live and neutral wiring to ensure a safe job site.

With its built-in flashlight and CAT IV safety rating, the FLIR VP40 is a must-have for preliminary job site checks for live wiring. The durable, pen-sized tester quickly identifies the presence of AC voltage without contacting wires, even in the latest safety outlets.


Read More

 

 

NP DRMSExpanding on its extensive product line for motion control applications, Sensata Technologies recently released the Crydom DRMS Series hybrid motor starters.

These new hybrid starters integrate the benefits of both solid state and electromechanical relay technologies to produce a compact device that can control electrical power delivery to motors as large as 4kW. Suitable applications range from access control, packaging equipment, lifts and escalators to industrial process control and machine tooling systems.

 


Read More...

Peers & Profiles

  • Prev
Michael Gindalang works for Dupar Controls as a panel builder for the elevator and keypad industry. ...
Energy Efficient Lighting is a LED lighting manufacturer with nearly 30 years of industry ...
Matt Stanson is a master electrician with over 30 years of experience. He now leads a team of ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
The National Electrical Trade Council (NETCO) is an industry-funded, not-for-profit organization ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
Born and raised in western India, Rupali’s passion for mathematics and science began at a ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
Allison Wood and Dominique Rivet are two apprentices who had a wealth of career options available ...
  In a recent sit-down Electrical Industry Canada was able to learn a little ...

Copper $US Dollar price per pound

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2019 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil