Future ProofingThis business case lays out a rationale for future-proofing buildings and provides tools that will enable building owners to think more strategically about how they are looking at their building management systems and make initial investments upfront for long-term benefit. Previously published in Part 1: four arguments to make in your business case, starting with why do it now. Here in Part 2: common misconceptions about future-proofing and what to consider before you start the process.

Common misconceptions about future-proofing

Misconceptions about what future-proofing is lead people to approach it incorrectly and make mistakes. Here are three misconceptions your business case needs to overcome.
1. Confusing future-proofing with Internet of Things (IoT) deployment. Often, discussions of evolving building system functionality lead directly to a focus on IoT strategy and implementation. Having a sound IoT strategy is essential to enabling new applications and value-streams, but it is equally important to address the more essential future-state functionality needs. The smartest future-proofing strategy satisfies both future-readiness and IoT readiness, following these four critical steps:

• determine the baseline, table stakes system functions that are required

• define the probable future-states and new functionality that will be required to address them

• identify the opportunities to drive new value through IoT applications that leverage the data from your building (e.g., occupancy status transforms into space utilization metrics, indoor positioning into customer loyalty applications)

• develop a strategy that allows for simple, cost effective expansion out of traditional energy management to a broader ability to manage the space, and to IoT readiness

2. Waiting for certainty is safe. It is human nature to sit on the sidelines and watch what happens before taking action. This way of looking at future-proofing is flawed. If a digital retrofit project is already planned, then the best opportunity to future-proof is now.

3. Piecemeal buying saves money. Another perceived “safe” approach is to buy only the equipment required to perform a specific retrofit and opt to “pay as you go,” instead of taking a broader strategic approach to meeting present and future needs. For example, if a project that specifies digital lighting and controls for a warehouse, but does not include similar systems for the office spaces, then the opportunity to leverage the energy savings to fund a complete project is foregone and the costs for future upgrades is simply “kicked down the road.”

Proper future-proofing should establish the technology infrastructure and distributed intelligence to enable IoT development on the existing system, rather than creating a parallel system, which can lead to inefficiency and redundancy.

Future-proofing the right way

Once a building owner embraces the economic benefit of investing in a future-proof lighting system, the next step is to understand the right way to do it. It’s critical to gather the right information and know the right questions to ask to frame conversations with your architectural designers, specifiers and contractors. A good place to start is to think about the future needs, opportunities and requirements for the building:

What are the big changes that are going to happen? How is the industry and more importantly the tenant business evolving?

What additional value can this investment unlock for my “customers”? The same data leveraged for energy savings applications can be turned into valuable applications that optimize both building management and occupant/customer experience. It requires thinking beyond energy savings to how can data make you more competitive?

What is the current and expected competitive landscape? What are peers and competitors in the space doing? How do you make sure the building is going to be competitive with other offerings?

Consider current and future safety and security needs. How do you ensure occupant safety in a dynamic, mobile workforce environment?

What regulatory or other compliance requirements will exist? Will there be new incentives for sustainability and green initiatives?

Shifting the focus to the lighting itself, it’s smart to calculate the total cost of ownership, especially given the longevity of most LED lighting. It is also essential to look at lighting solutions as platforms, as opposed to products. Doing this ensures that you will choose a system that is easily upgradable, can support many intelligent functions, and won’t become obsolete in a few years.

Lastly, be sure to frame the expected benefit and ROI in terms of tenant and other shareholder value, so the enhancement can be promoted. Talk to tenants about what you are trying to achieve with the design and how the investment will help them achieve their goals. With the right infrastructure in place, the facility can be differentiated and hence more attractive to tenants than other buildings.

Future-proofing is re-imagining the building space

Lighting systems are getting smarter and moving closer to supporting not only operational key performance indicators, but overall institutional goals. Adopting and nurturing a future-proof mindset about lighting requires thinking more broadly, holistically and strategically. The mindset shift must be toward configurability and upgradability. A solid approach is to evaluate retrofit investments on two levels: what the new system can do today and what might it do tomorrow.

Energy savings is a clear near-term benefit, but today’s smart lighting systems can provide substantially more value.

Spaces can be transformed into a powerful, connected infrastructure that can become a business builder. Data gathered throughout the building can be used to create business applications that deliver value-added services to tenants and increased return on investment for a smart building.

Even if you are not ready to employ enhanced functionality, making a strategic investment in a future-proof system can pay dividends down the road. A good way to think about future-proofing a building space by likening it to a computer or smartphone with upgradable applications over time — the space can evolve as needs and opportunities evolve. Future-proofing can also help building owners respond to and endure unforeseen risks factors, such as an economic downturn or a natural or physical disaster.

This article was first published online by Acuity Brands. Read Part 1 here: www.electricalindustry.ca/latest-news/4381-a-business-case-for-future-proofing-building-lighting-systems-part-1. Read the full article: https://cdn2.hubspot.net/hubfs/2327376/AC_6941_Smart Building Whitepaper Gated Content Campaign_0917/Whitepaper_FutureProofing.pdf

Changing Scene

  • Prev
  Glen Dimplex Americas is proud to announce that its Vancouver facility was recently ...
May 13 to 19 is Powerline Safety Week in Ontario, which is meant to inform people across the ...
Divisional Lighting Manager Salma Siddiqui, the initiative will focus on making Westburne the ...
As of April 30, Natural Resources Canada has new dry-type transformer energy efficiency ...
Ontario Power Generation (OPG), in partnership with the Six Nations of the Grand River Development ...
The Energy Council of Canada has chosen of Fort St. John, BC Mayor Lori Ackerman as Canadian Energy ...
The winners of the New Products Competition at the MCEE 2019 trade show were announced tonight; ...
The year was 2002: Jean Chrétien was Prime Minister, Avril Lavigne topped the charts, the ...
The company’s wholesale locations will be branded Robinson Supply, and the lighting and bath ...

Electrician Forum Brought to you by Schneider Electric

As industry experts you know the products you use everyday better than anyone and should have input on what information you receive about products and what could improve them.

Therefore, we want your insight on the biggest challenges or issues you face when installing loadcentres, breakers (CAFI, GFI's…) and other surge protection devices. We ask that you do not provide product specific details but rather your general issues and concerns or any questions that have come to mind while working with these product types. Provide us with your valued expert insight into the issues you have faced so manufacturers can better inform you about the installation and use of these products. Lets generate some discussion that will help guide the Industry.

Make your comments  HERE

 

ESA Powerline SafetyThe invisible impact of powerlines should never be underestimated. In the past decade alone, 19 people in Ontario have lost their lives from overhead powerline contact. May 13 to 19 is Powerline Safety Week, which is meant to inform people across the province to stay vigilant of powerlines when doing work at home or on the job.

"Our work in raising awareness of powerline safety won't be finished until there are zero injuries or lives lost from contact," says Dr. Joel Moody, Chief Public Safety Officer, Electrical Safety Authority (ESA). "All it takes is a misstep or careless error to change the life of you, your colleagues or family."



Read More

 

 

 

 

ABB Eco FactoryABB has an extensive portfolio of eco-efficient solutions and services that can help decouple economic growth from environmental impacts. In fact, over half of ABB's worldwide revenues are generated by technologies that combat the causes of climate change. The company’s goal is to increase this contribution from 57 percent in 2018 to 60 percent by 2020.

The company’s commitment to combatting climate change includes limiting the environmental impact of its own operations. ABB’s current target for climate action is to reduce its own GHG emissions by 40 percent by 2020 from a 2013 baseline.



Read More

 

 

Codes and Regulations Brought to You by the CSA Group

  • Prev
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the ...
In this article: Tables — Part B. This section of the Code contains 99 tables of essential ...
In this article: Section 58 — Passenger Ropeways and Similar Equipment. Rule 58-000 ...
  Unauthorized CSA Group certification marks have been found on wiring by Triumph Cable ...
In this article: Section 52 — Diagnostic imaging installations. The CE code is a ...
In this article: Section 46 — Emergency Power Supply, Unit Equipment, Exit Signs, and ...
  In this article: Section 44 — Theatre Installations. The CE Code is a ...
CSA has published C22.2 No. 60947-7-3, the harmonized standard for low-voltage switchgear and ...
  Electric welders. The CE Code is a comprehensive document. Sometimes it can seem ...

 

Wind Energy

Canada’s wind energy industry further expanded its installed capacity in 2018, while solidifying its status as the lowest-cost source of new electricity generation. Newly commissioned projects brought total national wind energy capacity to close to 13,000 megawatts (MW). Meanwhile, competitive auction results in Saskatchewan and Alberta confirmed the wind industry’s ability to continue to deliver record-low prices.

The six wind energy projects that were powered up in 2018 added 566 MW of installed capacity — a continuation of steady growth that contributed to an average annual growth rate of 20% per year since 2008.

Read more about Wind Energy...

Tools for the Trade

  • Prev
  IDEAL Industries has introduced Combination Drill Taps to its tool lineup. Combining the ...
  Stripping and crimping device, 100 - 240 V input voltage, for insulated ferrules with a ...
Professional all-in-one cutter/stripper for coaxial and twisted pair cables     ...
  Klein Tools' Coax Explorrer 2 tests coaxial cable and maps up to 4 locations   ...
  Ideal Industries' T-14 wire stripper s are ideal for all professionals working within the ...
  The ATS850 conveyor eliminates all types of electro static discharge requirements. ...
  Lorik Tool & Automation has the experience and ability to manufacture a variety of ...
  Ideal Industries' 26 piece insulated Journeyman kit is ideal for new electricians or for ...
  Klein Tools Deluxe Fish Rod Set comes in 19 pieces that when assembled can fish wire and ...
  BendWorks Software was designed to help electrical contractors adopt this new process ...

Solar Cell

A joint research team has developed a new type of highly flexible and stable solar cell that could be used in wearable electronics.

The power supply is vital to the safety of wearable electronics. Perovskite solar cell (PSC) has been widely used to manufacture flexible batteries because it is highly efficient, cheap, and easy to use. Perovskite is a material with the same type of crystal structure as calcium titanium oxide.

The flexible substrate is the key factor to determine the performance of PSCs.

Read more about Flexible Solar Cells...

 

 

Product News

  • Prev
Expanding on its extensive product line for motion control applications, Sensata Technologies ...
AutomationDirect has added high-speed I/O modules and a serial communications expansion module to ...
Looking for a smart and efficient alternative to dynamic braking? Look no further. The R1000 ...
Thinking of upgrading your current system? Trying to keep your costs low? IDEC has the answers ...
The ABB ACQ580 variable frequency drive (VFD) for the water and wastewater industries ...
The popular, classic TWR LED wall pack luminaire now comes with adjustable lumen output technology! ...
EarthTronics expands its high-efficiency traditional wall pack series with a 12-watt ...
The dual-color WLS15 low-profile strip light from Banner Engineering is a durable yet lightweight ...
FLIR Systems have released the FLIR VP40, a non-contact voltage detector for use in North America ...
Belden Inc., has released its new portfolio of Safe-T-Line Circuit Integrity (CI) cables.   ...

Flir VP40FLIR Systems have released the FLIR VP40, a non-contact voltage detector for use in North America designed for field-troubleshooting and verification of residential, commercial, and industrial electrical installations. The VP40 makes it easy to quickly troubleshoot live and neutral wiring to ensure a safe job site.

With its built-in flashlight and CAT IV safety rating, the FLIR VP40 is a must-have for preliminary job site checks for live wiring. The durable, pen-sized tester quickly identifies the presence of AC voltage without contacting wires, even in the latest safety outlets.


Read More

 

 

 

Peers & Profiles

  • Prev
Michael Gindalang works for Dupar Controls as a panel builder for the elevator and keypad industry. ...
Energy Efficient Lighting is a LED lighting manufacturer with nearly 30 years of industry ...
Matt Stanson is a master electrician with over 30 years of experience. He now leads a team of ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
The National Electrical Trade Council (NETCO) is an industry-funded, not-for-profit organization ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
Born and raised in western India, Rupali’s passion for mathematics and science began at a ...
After eight months, 263 events, 17 broken clocks, and thousands of competitors, Ideal ...
Allison Wood and Dominique Rivet are two apprentices who had a wealth of career options available ...
  In a recent sit-down Electrical Industry Canada was able to learn a little ...

Copper $US Dollar price per pound


 

EHRCIn a recent interview with the The National Post, Electricity Human Resources Canada CEO Michelle Branigan said the need for workers in Canada’s electricity industry is “extremely critical.”

The industry directly employs almost 107,000 people, but less than 1 in 20 is aged 25 or under, only 1 in 4 is a woman, and just over 1 in 10 is from a visbile minority.

These statistics are from EHRC’s Workforce in Motion, a labour market intelligence research initiative for the years 2017-2022. The research report is a planning and informing tool for a wide range of electricity sector stakeholders and provides critical information to the sector for both short and long term resource planning.

Read More

 

 

Kerrwil Publications

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2019 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil