Arc Flash Incident Involving a Maintenance Switch

Maintenance Switch

 

Feb 12, 2016

This case study article examines the plans and processes reviewed and considered, the strategy deployed to manage/reduce arc flash hazards, and then lessons learned in the implementation of new systems to improve electrical workplace safety. The setting: a chemical processing facility with a robust electrical workplace safety process. The site experienced an actual arc flash event while energized work was being performed.

Photo courtesy: www.utilityproducts.com

The facility was planning energized work for an existing 480 V low voltage switchgear assembly that was an existing piece of equipment in the plant. During a process upgrade in the facility, an energized work permit was issued to remove three abandoned load conductors from an existing 480 V low voltage switchgear assembly cable compartment.

The work permit was very detailed and included tools planned for use in the project and required PPE for workers performing the task based on the incident energy defined by a recently completed arc flash hazard assessment. The defined task for the work order required the site contractor to use a nylon rope, which was typical with this type of project, disconnecting the de-energized cables and working to raise them from the top cable compartment. Figure 10 showsa layout of the low voltage assembly involved in the work.

The de-energized cables were to be removed from Cubicle 5, with still energized conductors existing in Cubical 4 at the bottom of the cable wireway. The rope used was not able to grab the conductors and would slip off of the cable, so the electrical contractor elected to employ a “come along” to assist in the removal, as the come along could apply more force. The first conductor was successfully removed with this new tool. Upon removing the second conductor, a small arc flash was observed in the lower compartment. Simultaneously, the lights to the plant went out.The contractor stopped work and waited for plant electricians to arrive, not knowing what had just occurred.

The event caused the entire plant to shut down, stopping work on the project until an analysis could be completed. It was determined that the chain of the come along had drifted below where the work was being performed and into energized Cubicle 4. Fortunately, the damage to the wall of the switchgear and come along tool was minimal, which is shown in Figure 11.

Post event analysis proved that the chain of the come along had drifted below where the work was being performed and into an energized cubicle. The chain touched an energized terminal and arced to ground, touching both phase conductor and cabinet ground metal below the non-energized cubicle where the electrician was working. After reviewing minimal damage and completing the project while de-energized, the plant switchgear was cleaned and re-energized. Fortunately, total downtime for the plant due to this event was minimal. No loss of equipment or injury to any employee occurred as a result of this event.

 

Eaton Arc Flash Safety

 

Low voltage assembly involved in planned energized work. The planned task included removing cables from de-energized Cubicle 5 while Cubical 4 in an adjacent section was still energized.

The important take-away here is that the arc flash study was completed before energized work was performed. The upstreamlow voltage power circuit breaker with a special maintenance switch setting discussed previously employed technology to clear the fault faster than the microprocessor instantaneous setting of the circuit breaker trip unit.

Calculations were previously performed that quantified a reduction in incident energy from 17.7 cal/cm2 to2.9 cal/cm2 using the special maintenance setting. Both workersand equipment were saved as a result of a total clearing time at 40 milliseconds as defined by the manufacturer’s published trip curves[8].

Lessons learned

This case study unequivocally proves that planning for the unplanned event can save lives. Some of the key lessons learned here:
• mistakes will happen on even the best planned projects. A change in tools is what led to this arc flash event
• proper planning and leveraging of all accessible resources prevented what could have been a catastrophic event
• leveraging technology can often deliver a reduction in the available energy. Using more sensitive settings can save both people and equipment should an arc flash event occur

Eaton Come Along

At left, a “come along” tool used for energized work and at right, damage to panel after phase to ground arc flash event with an upstream device with maintenance setting capabilities.

This case study is one of four published online by Eaton and has been lightly edited by EIN. See all case studies: http://www.eaton.com/ecm/groups/public/@pub/@eaton/@corp/documents/content/pct_1562591.pdf.

 

Related Articles


Latest Articles

  • Building a Greener Future – BuildForce Canada Report

    May 3, 2024 Retrofitting Canada’s residential, commercial, and institutional building stock to incorporate sustainable fuel sources, technologies, and materials could require as many as 57,000 additional construction workers and generate more than $81 billion in new construction investments by 2032. A new report prepared by BuildForce Canada, Building a Greener Future: Estimating the impact on construction… Read More…

  • HELUKABEL White Paper: “PUR or PVC”

    HELUKABEL White Paper: “PUR or PVC”

    May 3, 2024 The jacket material is a key factor when looking for the right cables and wires. The outer jacket performs a multitude of functions that ensure the durability, safety and performance of the cable or wire. Users must often choose between polyurethane (PUR) and polyvinyl chloride (PVC). In our new white paper “PUR… Read More…

  • Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    April 26, 2024 Electric Avenue, a leading innovator in electric vehicle (EV) charging solutions, is thrilled to announce significant improvements to the cold temperature performance of its flagship products, the Watti Pro Lite and Watti Home Gen2. After comprehensive environmental testing, both chargers now boast an impressive operational rating of -40 degrees Celsius, surpassing the… Read More…

  • Electrical Incidents in Alberta for 2023

    Electrical Incidents in Alberta for 2023

    April 26, 2024 Regulations under the Safety Codes Act require that all electrical accidents and power line contacts be reported. This annual report by Municipal Affairs compiles a summary of incidents reported during the calendar year. Organizations in the electrical industry may wish to use this information for promoting public awareness of electrical safety risks…. Read More…


Changing Scene

  • Alberta Continues Campaign to Attract Skilled Trades People from Other Provinces

    Alberta Continues Campaign to Attract Skilled Trades People from Other Provinces

    May 3, 2024 To help fill critical job vacancies in the skilled trades, Alberta’s government has launched the third phase of the successful Alberta is Calling campaign, which is now in-market in British Columbia, Québec and Ontario. This campaign is bolstered by the Alberta is Calling Moving Bonus – a one time, $5,000 refundable tax… Read More…

  • Siemens Launches Depot360 Zero-Emission Fleet Management in Canada

    Siemens Launches Depot360 Zero-Emission Fleet Management in Canada

    May 3, 2024 With transportation being the second biggest emitter of greenhouse gases and road transport responsible for almost three quarters of these emissions globally*, Siemens Smart Infrastructure has launched Depot360, a portfolio to optimize fleet electrification. The initial focus of the solution is on logistics vehicles, municipal transit and private bus fleets within depot,… Read More…

  • Le Salon Lumen: Lumen Hosts 2024 Quebec Electrical Industry Blockbuster Customer Event

    Le Salon Lumen: Lumen Hosts 2024 Quebec Electrical Industry Blockbuster Customer Event

    (Photo caption: (From left to right) Lumen President, Serge LeBlanc, Sonepar Canada President, George McClean, Sonepar Americas President, Rob Taylor, and Sonepar CEO, Philippe Delpech in the Lumen booth, at Le Salon Lumen.) May 3, 2024 This month, Lumen held their 12th edition of the Salon Lumen, the largest exhibition in Quebec’s electrical industry. The… Read More…

  • Surgepure Announces Partnership with Focus Electrical Sales for the East Coast

    Surgepure Announces Partnership with Focus Electrical Sales for the East Coast

    May 3, 2024 SURGEPURE CORPORATION, a manufacturer of non-degrading hi-energy surge protection devices, announces a strategic partnership with Focus Electrical Sales. Based in the Maritimes, Focus Electrical Sales represents leading edge lighting and electrical manufacturers in North America. Focus adds extensive local application and technical support with offices in Nova Scotia, New Brunswick and Newfoundland,… Read More…