Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles

  • Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    April 26, 2024 Electric Avenue, a leading innovator in electric vehicle (EV) charging solutions, is thrilled to announce significant improvements to the cold temperature performance of its flagship products, the Watti Pro Lite and Watti Home Gen2. After comprehensive environmental testing, both chargers now boast an impressive operational rating of -40 degrees Celsius, surpassing the… Read More…

  • Electrical Incidents in Alberta for 2023

    Electrical Incidents in Alberta for 2023

    April 26, 2024 Regulations under the Safety Codes Act require that all electrical accidents and power line contacts be reported. This annual report by Municipal Affairs compiles a summary of incidents reported during the calendar year. Organizations in the electrical industry may wish to use this information for promoting public awareness of electrical safety risks…. Read More…

  • New Development Permit Exemptions in Winnipeg

    New Development Permit Exemptions in Winnipeg

    April 26, 2024 The City of Winnipeg’s Planning, Property & Development Department will implement zoning bylaw updates in phases, starting with development permit exemptions. Recent bylaw amendments, approved on March 21, 2024, grant the PP&D Director authority to determine the need for a development permit. These exemptions aim to streamline the permit process for projects… Read More…

  • ABB’s Care and Modernization Services Breathe Second Life into Legacy Equipment

    ABB’s Care and Modernization Services Breathe Second Life into Legacy Equipment

    April 23, 2024 In today’s world with environmental concerns top of mind, ABB offers sustainable options to extend equipment life through refurbishment and repair—which support a circular economy and reduce landfill footprints. In this context, ABB Canada’s Brampton facility is recognized for offering customized solutions for a growing list of ABB , GE, and non-ABB… Read More…


Changing Scene

  • Northern Cables Welcomes Mike Christiansen as Western Canada Territory Manager

    Northern Cables Welcomes Mike Christiansen as Western Canada Territory Manager

    April 29, 2024 Northern Cables Inc., a pioneer in the Electrical Wire & Cable industry, is delighted to announce the appointment of Mike Christiansen as Western Canada Territory Manager. This key addition to the team is a part of Northern Cables’ strategic initiative to expand its market presence and enhance customer engagement across Western Canada…. Read More…

  • Southwire Announces Investment in Condoit

    Southwire Announces Investment in Condoit

    April 26, 2024 In support of Southwire’s focus on strategic growth, the company is pleased to announce an investment in Condoit, a software platform for electrical design, analysis and collaboration.  Condoit, based in Birmingham, Ala., has developed a software application to dramatically simplify the process of documenting “as-built” drawings of electrical systems. Condoit’s software aids… Read More…

  • Upcoming EV & Charging Expo to Feature FLO New Technology  

    Upcoming EV & Charging Expo to Feature FLO New Technology  

    April 26, 2024  FLO will be a featured exhibitor and speaker at the EV & Charging Expo in Toronto held May 1-2, the premier electric vehicle and charging trade show and conference for fleet operators, building owners and companies in the EV industry.  FLO’s exhibit, which will be located at booth No. 125, will feature FLO’s newest… Read More…

  • ABB Pioneers Advanced Cable Protection Solution Crafted from Discarded Ocean Fishing Nets

    ABB Pioneers Advanced Cable Protection Solution Crafted from Discarded Ocean Fishing Nets

    April 24, 2026 An estimated 1 million tons of abandoned, lost and discarded fishing gear (ALDFG), the equivalent of 50,000 double-decker buses, litter the world’s oceans every year, endangering marine life as a major source of ocean plastic pollution. To help address dangerous marine pollution, ABB Installation Products pioneered industry-leading cable protection crafted from 50%… Read More…